Started setting things up for winter projects.
Kohler K341 engine. Spark plug wire was pulled out of block. Planed on repairing the magneto ignition. Pulled the flywheel. No magneto coil, center bar for the coil missing. Capacitor missing. Brand new set of ignition points.
Said a few things, well darn, shucks, and other things. Wondered why anyone would spend the time to remove the flywheel, remove the magneto, then reassemble the engine. Thought about it for a while. Will convert to battery powered ignition which will be a lot less expensive than purchasing a magneto coil and trying to find the bar. Plus, I have the parts on hand for the battery ignition.
Black walnuts. Most nuts are hulled and in storage bins, curing. Winter project, cracking and picking the meats. Black walnuts fell about 2 weeks before the local hulling station opened. Poor crop this year. Talked to the operator of the hulling station. He had only 141 pounds of nuts purchased on that date. Last year the hulling station purchased over 22K pounds of hulled nuts.
Standard Cub. Planning on removing the rear end from a narrow framed, manual drive, Cub Cadet and rebuilding the standard Cub's transmission.
Wife's project. Wife has some thick rough edged black walnut slabs that she wants to turn into stand. Past couple of winters wife and I have rebuilt camel backed trunks.
Kohler K341 engine. Spark plug wire was pulled out of block. Planed on repairing the magneto ignition. Pulled the flywheel. No magneto coil, center bar for the coil missing. Capacitor missing. Brand new set of ignition points.
Said a few things, well darn, shucks, and other things. Wondered why anyone would spend the time to remove the flywheel, remove the magneto, then reassemble the engine. Thought about it for a while. Will convert to battery powered ignition which will be a lot less expensive than purchasing a magneto coil and trying to find the bar. Plus, I have the parts on hand for the battery ignition.
Black walnuts. Most nuts are hulled and in storage bins, curing. Winter project, cracking and picking the meats. Black walnuts fell about 2 weeks before the local hulling station opened. Poor crop this year. Talked to the operator of the hulling station. He had only 141 pounds of nuts purchased on that date. Last year the hulling station purchased over 22K pounds of hulled nuts.
Standard Cub. Planning on removing the rear end from a narrow framed, manual drive, Cub Cadet and rebuilding the standard Cub's transmission.
Wife's project. Wife has some thick rough edged black walnut slabs that she wants to turn into stand. Past couple of winters wife and I have rebuilt camel backed trunks.