WALLS are done, finally

Well after a month of weekends, walls are insulated, drywalled, sanded and painted, trimmed, ceiling is done as well, excluding the ceilings fans that need to go up (ran outta money). got the peg board framework done and pegboard mounted, and trimmed out as well this weekend, even a little creative with some scraps and made boxes with "hats" over the windows to conceal blinds ifn i put some up.

walls-southwest2.jpg


walls-southeast.jpg


walls-northwest.jpg



walls-northeast.jpg


Next project, i have to build 5 custom benches, 2 8 ft benches each side of radial arm saw. an 8 ft bench about 6 ft in front of table saw, and 8 ft bench directly behind table saw (to catch sheets of plywood) and an 8 ft bench south of table saw to hold bench top equipment. looks like my christmas "break" will be packed with work. PS. wife is doing great, getting around fairly good, no smokes x6 days, not too crouchy, course step mom still here, we'll see when see leaves friday. If i havent said it yet. Merry Christmas to all! John PPS Let me know what you think.
 
thanks steve, actually already did the epoxy thing on the floor, that was first, didnt want to get the floor trim molding dirty when i epoxied, so i did it first.

john
 