Septic field question

Jackman

501 Club
So 27 years ago I had a new 1,000 gallon septic and a 120 foot field (4 laterals) installed on my often wet lawn , the system worked all those years perfectly but starting last July we went into a rainy spell that has saturated the ground like I've never seen :shock: and as a result now I have septic muck coming to the surface along with a foul smell . Anyone have advice we need a big dry spell or maybe my field is on the way out after a 27 year run....
 
John *.?-!.* cub owner":1g37k4j7 said:
When was the last time the tank was pumped out? It needs done every few years.
Yup every 3-5 years. The solids are meant to stay in the bottom of the tank but if they rise up to the level of the out flow pipe it can clog the field. 27 years is a pretty good run for a septic field. May need to redig and pour new stone.
Try getting it pumped and acid addictive poured in. It might get it working again.
 
We have ours pumped every two (2) years, though with the kids moving out we may be able to stretch it to 3 years.
Back a few years ago we had so much snow melt and rain, combined with a seasonal high ground water table, the leach field couldn't take on any more water. We had the tank pumped completely dry, water and all, and the water kept backflowing into the tank. Took a 2nd full pumping to stop the backflow. No laundry or baths, just quick showers, "if it's yellow let it mellow - if it's brown flush it down", no dishwasher, etc. for a couple of weeks and we were fine.
Our system would never pass muster with current requirements for septic systems.

Sounds to me like you are in for a replacement leach field.
 
If the tank has not been cleaned for a long period of time solids will build up and enter the distribution tank. The distribution tank is where those four lines lead to the field. If those lines fill with solids your whole field can become contaminated. If that happens you can expect to have all the lines dug up and replaced as well as possibly a lot of the soil from the field. Time to call a plumber. The county health department inspects our tanks every year so we don't have that problem.
 
We'll thanks for the feedback 8) , we've been kinda anal about the maintenance of this set up on account of my property being almost swamp like. The tank has always been pumped 2-3 years and also my grey water and showers went to a dry well the only thing the septic tank got was two toilets and two bathroom sinks ,,,, but two years ago we redid a bathroom with new shower and the contractor said I was way overkill on protecting my septic so to save a little cash we piped one shower in to the septic , contractor also said its good to have some water flow from a shower into the septic , wish I didn't listen to him :evil: I think that extra shower might be the cause of my grief but at the sametime I suspect that the super wet weather that we have been getting since July might be a part of it :? ......... Anyway the septic guy is coming over saturday to pump and offer his opinion I suspect he will suggest a new drainfield .......
 
Peter Person":vhmv4c27 said:
We have ours pumped every two (2) years, though with the kids moving out we may be able to stretch it to 3 years.
Back a few years ago we had so much snow melt and rain, combined with a seasonal high ground water table, the leach field couldn't take on any more water. We had the tank pumped completely dry, water and all, and the water kept backflowing into the tank. Took a 2nd full pumping to stop the backflow. No laundry or baths, just quick showers, "if it's yellow let it mellow - if it's brown flush it down", no dishwasher, etc. for a couple of weeks and we were fine.
Our system would never pass muster with current requirements for septic systems.

Sounds to me like you are in for a replacement leach field.

Sounds very similar to what we have going on I hope we get a dry spell soon so I can decide if its a septic problem or just a temporary issue due to unusually wet weather .
 
Here, the drainfield requires a minimum vertical separation from the water table and is also required to be buried to a stated minimum depth. If the water table isn't deep enough to make that possible, they haul in enough material to get the depth. With luck, it can be done with some filling and still have a typical gravity flow septic system. Worst case, the design could end up with a full- blown mound system.

It sounds like you may need to go at least part way down the path to gain some separation from the water table.
 
I'm on day 2 of a new installation of my septic. Leachlines collapsed. Was an old and small system. Regulationals now require a system about 4x the size on leach fields requirements. They brought in a backhoe, dug down 8 ft. and collected a soil sample to see how that soil drains. The county health inspector came out and tested it and passed it. I'm having to tear into about 1/2 an acer of my field to make room for it. We also had roots from the trees growing in the pipes and clogging up in several areas.
 
No regs on account of old homes are grandfathered for me and that's a good thing cause the town if they could would spend a ton of my money , my field currently is 4 laterals of 40 feet each plastic pipes buried in crushed stone , the ground goes from very wet to very damp , full sun and no trees and flat ground, wish I could build what you have deep in the ground if I dug down 8 feet I'd be in 6 feet of water , a horrible situation for a drain field I'm not optimistic on what the septic guy will tell me grrrr
 
If it won't perk, then an engineered field will be required. Those are more expensive and are basically built above the current ground level and then buried in pea gravel.
 
Jackman":2xd12m4a said:
No regs on account of old homes are grandfathered for me . . .
In most places, grandfathering of existing systems ends if the system fails. Reconstruction has to be done to current requirements. Your locality may be different, but don't plan on it!
 
Jim Becker":394iw0jw said:
Jackman":394iw0jw said:
No regs on account of old homes are grandfathered for me . . .
In most places, grandfathering of existing systems ends if the system fails. Reconstruction has to be done to current requirements. Your locality may be different, but don't plan on it!

I'm a Rebel the town won't know a thing and even if they do I don't care :mrgreen:
 
Jackman":19jpqape said:
Jim Becker":19jpqape said:
Jackman":19jpqape said:
No regs on account of old homes are grandfathered for me . . .
In most places, grandfathering of existing systems ends if the system fails. Reconstruction has to be done to current requirements. Your locality may be different, but don't plan on it!
I'm a Rebel the town won't know a thing and even if they do I don't care :mrgreen:
Might want to research your state, county, and local laws concerning sewage disposal.

https://health.mo.gov/living/environmen ... wsregs.php
Above, a partial listing of Missouri State laws concerning sewage disposal.

Edit. The following quote is from Missouri's Environmental Protection laws. OWTS = onsite waste treatment systems.
"The Missouri Department of Health and Senior Services (DHSS) has set minimum state standards for OWTS. These standards cover new systems and major changes to existing systems. Some examples of major changes are replacing a sewage tank, and replacing or expanding an absorption field."
 
Thanks 8) this house has been here for 90 years using the same type septic system , I'll probably move it over a bit but having some state or local dept spend my hard earned money on an above ground system is not going to happen , in the end it will work as it should :D
 
My new Rebel uncoded and unpermitted septic field is in :D . New field is 200 ft of laterals in a very large excavation , he dug down about 3 feet and created a open rectangular pit and added 25 tons of 1's and 2's drainage stone, next was the piping 4 laterals totaling 200 feet then more drainage stone about 15 tons over the piping probably 1 foot of coverage ,next was landscape fabric followed by covering it back up with the soil removed to create the pit ,rake out grass seed and 3-5 weeks from now it'll look like nothing was ever done. This setup is big and the amount of drainage stone he put in (2 - 20 ton truck loads) makes me confident that it will work well ... cost was 5,000 dollars well spent and had the town been involved just add 500 or so more , I say no thanks to that part :censored:
 