Some interesting tidbits I learned as I prepared for the Barnyard Bash. Of course this newfound knowledge does not have to be used just for CubFest preparations. It can easily be applied to everyday situations. All of this pertains to our friend “Mr. Electric”.
First, when pulling new wire for outdoor security lights it is always a good idea to keep track of where you are as you progress.
When you pull new electric into a box located in your hay loft, that has hay in it by the way, for an existing light and plan to tie in with another light several days later, you may have something that looks like this:
That's all well and good and you can even turn the juice on to see if the light is working properly.
After the wiring is run for the second light (a couple weeks later in this case) you possibly would have this:
Now the plan is to snip the first wire so you can splice it and the second wire to the same circuit. But wait, what if you get in a hurry and snip that wire and hear a big ol' ZZZAAAPPP? You get a little thrill, that’s what! I can guarantee you that! You then will 1)drop the snips (insulated electricians snips by the way, thankfully), 2)jump back, 3)probably check your pants, 4)look for burning hay and then 5)go down to turn the power off. Fortunately #’s 3 & 4 led to no problem and I finished the job safely and easily enough.
Next, comes using an air compressor. If your wire looks anything like this, the odds are your helper will not want to inflate any tires. This was the case in my situation so I ended up plugging this dude in so I could use it.
After a little handiwork several days later I ended up with what you see in the next picture but not until after my helper (Bob) had left.
Lastly, many of you will recall seeing the picture of Rosie on a ladder installing outlets on the shop ceiling for the lights. In reality, Rosie would never really climb a ladder, but fortunately I persuaded her to participate in some photo ops. :lol: Anyway, these outlets would be connected to two separate circuits. The lights had previously been lit using extension cords to the wall outlets. I had also installed additional outlets to the center posts in the shop. These outlets would be connected to another two circuits. None of this had been connected to the panel prior to the Bash.
Saturday morning, before we got a good start in the shop, I took about a half hour to shut down the power in the shop to get the four circuits connected in the panel. Here is where using safe practices comes in.
Since the panel is wired directly to the meter I could shut off the main to work in the box but the main feed was still live, meaning the two big wires at the top of the panel had 200 amps waiting to jump out at any unsuspecting fool. These are the two wires I wanted to avoid at all times. (Refer back to the wire snipping in the hay loft for a good enough reason) While poking around in this type panel it is important to remember to remove your cell phone from your pants pocket. If you happen to have a hand in the panel and David Grapes calls you at that precise moment, the result may cause you to feel more than the vibration of the phone in your trousers. :shock:
The next thing to remember is to be aware of who is watching you work and what they have in their hands. If you reach into a live panel and you see a sudden flash it could be one of two things; you just electrocuted yourself, or someone took a picture of you working. Either of those scenarios could also cause the aforementioned “Tingle in the Trousers” feeling. In this instance I was told there would be a flash, but it still gives you a little start when it happens.
Steve-N-TN, was kind enough to hold the flashlight while I did this panel work and from the laughter I kept hearing from him behind me I think he was enjoying the whole show.
Seriously though, use caution when working around electric. Many of us become too comfortable when doing this work and safety is sometimes forgotten. Don’t let it jump out and bite you.
First, when pulling new wire for outdoor security lights it is always a good idea to keep track of where you are as you progress.
When you pull new electric into a box located in your hay loft, that has hay in it by the way, for an existing light and plan to tie in with another light several days later, you may have something that looks like this:
That's all well and good and you can even turn the juice on to see if the light is working properly.
After the wiring is run for the second light (a couple weeks later in this case) you possibly would have this:
Now the plan is to snip the first wire so you can splice it and the second wire to the same circuit. But wait, what if you get in a hurry and snip that wire and hear a big ol' ZZZAAAPPP? You get a little thrill, that’s what! I can guarantee you that! You then will 1)drop the snips (insulated electricians snips by the way, thankfully), 2)jump back, 3)probably check your pants, 4)look for burning hay and then 5)go down to turn the power off. Fortunately #’s 3 & 4 led to no problem and I finished the job safely and easily enough.
Next, comes using an air compressor. If your wire looks anything like this, the odds are your helper will not want to inflate any tires. This was the case in my situation so I ended up plugging this dude in so I could use it.
After a little handiwork several days later I ended up with what you see in the next picture but not until after my helper (Bob) had left.
Lastly, many of you will recall seeing the picture of Rosie on a ladder installing outlets on the shop ceiling for the lights. In reality, Rosie would never really climb a ladder, but fortunately I persuaded her to participate in some photo ops. :lol: Anyway, these outlets would be connected to two separate circuits. The lights had previously been lit using extension cords to the wall outlets. I had also installed additional outlets to the center posts in the shop. These outlets would be connected to another two circuits. None of this had been connected to the panel prior to the Bash.
Saturday morning, before we got a good start in the shop, I took about a half hour to shut down the power in the shop to get the four circuits connected in the panel. Here is where using safe practices comes in.
Since the panel is wired directly to the meter I could shut off the main to work in the box but the main feed was still live, meaning the two big wires at the top of the panel had 200 amps waiting to jump out at any unsuspecting fool. These are the two wires I wanted to avoid at all times. (Refer back to the wire snipping in the hay loft for a good enough reason) While poking around in this type panel it is important to remember to remove your cell phone from your pants pocket. If you happen to have a hand in the panel and David Grapes calls you at that precise moment, the result may cause you to feel more than the vibration of the phone in your trousers. :shock:
The next thing to remember is to be aware of who is watching you work and what they have in their hands. If you reach into a live panel and you see a sudden flash it could be one of two things; you just electrocuted yourself, or someone took a picture of you working. Either of those scenarios could also cause the aforementioned “Tingle in the Trousers” feeling. In this instance I was told there would be a flash, but it still gives you a little start when it happens.
Steve-N-TN, was kind enough to hold the flashlight while I did this panel work and from the laughter I kept hearing from him behind me I think he was enjoying the whole show.
Seriously though, use caution when working around electric. Many of us become too comfortable when doing this work and safety is sometimes forgotten. Don’t let it jump out and bite you.