Couple of 3 plus inch rains washed out and broke off the lower edge of the low water crossing. Largest chunk of concrete came out of the hole in the crossing. The lower edge, right side of the crossing is also broken off. Pieces of concrete were carried 50 to 70 feet down stream.
High lift cut a trench at the bottom of the crossing and several long tranches to drain off the water below the crossing. Then broke off undermined sections of the crossing. Highlift then moved hugh rocks and concrete chunks back into the bottom of the trench to form a backboard for concrete. The bottom of the trench is about 6 or 7 feet below the roadway.
In the mean time we cut out the old culvert and jack hammered out the fill and old concrete to install a much larger culvert. Rebared and tied reinforcement for the new cement.
I lost count. There were 7 or 8 full truck loads of cement used to rebuild the low water crossing and repair the west end (far end in photo) of the drive.
Work started around 7:30 AM and we were finished by 6 PM.
The high lift filled the area below the crossing with gravel almost up to the road bed. The above photo was taken about 12 hours after another 3 1/2" rain.
2nd low water crossing. Washed out at the same time as the previous pictures. Soil/gravel/rock used to extend up to the steps in the photo. Son and I hauled rock for several days to faced the hole with big rocks to prevent further wash out. Couple days later we got an other gully washer. Washed the rocks down stream.