That was on YTMAG also. Some of the members there posted that model crane has a computer to monitor load, angles, extension, etc. that should have prevented that.
Most of the newer cranes have on-board computers. Ray's 30 ton (Sterling chassis), his new 50 ton (Western Star quad/quad chassis) and the new to replace the 27 ton, 30 ton (IH chassis) all have computers on board. However like all OS's it requires input by the operator and requires the operator to stay within the envelope the program alots. However the puter can be overridden and when that happens -- weird stuff usually follows.
Ray was telling me about that video , apparently one of his operators saw that vid on YouTube and passed the story around. This is the first time I have seen the video but not the first I heard of it.
Looks like a Grove TMS700E or a slightly earlier version .. probably around 50 tons ..
We were talking about it last Sunday as we had to put his 30 ton across the street from his place in one of our neighbours front lawn. He was redoing the back deck and landscape -- kinda hilly -- and rolled a Kubota on it's side. No room to get anything in to pull it back vertical, so Ray had to get the 30 out. He jokingly said we don't want a repeat of the video this afternoon... :lol: Boom was over the house pretty much the same way in the beginning of the above video and with the boom extended he only had 3,000lbs of workable load to safely and I repeat safely do the needed work. He also kept his boom extended and high - then cabled out to lower the hook. Kept the boom up as we brought the Kubota vertical - judiciously using boom and cable to do the job. Stayed within in the limits the computer calculated.