New Driveway

Sure there is they had a wet spring. Ought to be enough for 2 more loads. Then they will use the mule team to bring some borax out of death valley to top it off.

Bill
 
Mike:

That might be an avenue for me to look at for my driveway when the tractor trailers etc., are all done bringing in the stock for my logging road... one good thing about tractor trailers hauling fill - it sure packs the driveway down.

I got some grindings or millings whatever you might call them in your area -- it is the asphalt that is ground prior to resurfacing.. we had about 60 or 70 loads of the stuff brough in - mostly tandem loads.. about 16 yeards each.. I learned to grade with the TD7/8 and then used the Bomag and the Ingersoll-rand vibrating packers to almost seal the grindings. With all the traffice, it makes a good base. In time, maybe after all the trucks are done hauling, we will top it with 2 or 3 inches of good asphalt.. gotta do the curbs first though :!: :!:

Oh, one note about the Bomags -- you don't want to drive them any distance... the one I used was up the road.. about 4 kms I guess... the float wasn't available.. so I drove it sort of, :? :roll: almost 4 kms home... NOT GONNA DO THAT AGAIN :!: :shock: :shock: :? :lol: :lol: :lol:
 
Mike,
Your rock work around your place is exceptional. It looks great, how about a couple of photo's of the over all layout?
 
I have not been keeping up lately on cub.com because this has turned into a major project. Hopefully we will put the stabilizing polymer on the AB next week. After that the brown minus granite and the final gluing 8) Was able to get 20 loads of dirt last week, so now the driveway has turned into a major landscaping thing. When I have a break I go in and look at my Cubs :( ...I have made no progress on my generator/power unit project. :( ..or any of the things I had wanted to do this winter on the Cubs :( When the driveway is finished though I will have a good outside work area

Here are a few more pictures.

125434027.jpg

125434028.jpg

125434029.jpg

125434026.jpg
 
Mike,
You have a beautiful place there, your hard work has paid off! You should be proud. You sound like my Dad after he retired, he got so busy he said he would have to go back to work to rest!
Sure looks like a great place for a Cubfest West!!
 
I'm finally finished with the AB surface. :shock: It took me a liitle longer because I edged around the AB with a 4-5" deep trench to form a little stem wall for the crushed granite and glue.

It is very smooth and should make a good surface for the finish material, brown 1/4" minus crushed granite. We had 25 T delivered yesterday and have begun to spread it.

Today the president of SoilWorks is coming down to see the job and oversee the gluing process. He is bringing an implement that mixes the glue thoroughly into the 3" of brown crushed granite. When this has been done we will roll it out and let it dry.
 
Great job Mike. 8)

Is that a freshly painted cub trailer I see in the background :?:

If so, when and where did you find it :?:
 
Chad Falkenberg, SoilWorks owner/pres., was here all day last Friday. Very smart young man. Not a day over 30 yr. old. He helped us to put the glued minus material down correctly.

He brought down the tilling implement. It is similar in design to a small road reclaimer. When the glue is applied the implement mixes it thoroughly to a depth if 3" Then the granite and glue is rolled out with a small 1.5 T roller to make a smooth hard finish.

Got a FREE UPGRADE :shock: :D :D . : We had intended to go with about 1.5" of minus, but using the tilling implement requires that we use a minimnum of 3" to keep the implement from pulling up any AB roadbed underneath and putting limestone into the granite/glue mixture.
 
We have spread out 70 T of the 1/4" minus brown crushed granite now and its all been glued. Today we will sweep in a little more minus material here and there and apply a topical glue coating.

Yes Bud, you are correct. I was wondering if anyone would spot my Christmas present from Anni. :D :D :D. 1956, Model 528, Cub Trailer.
 
Well, I am happy that this is finished. It was more work than I expected :D :D ...but what else is new right.

Here are some pictures showing the gluing process:

Glue is applied in a heavy coat and grade gets final adjustments.
128023411.jpg


Tilling implement mixes the glue and the minus granite.
128023410.jpg


Granite and glue mix prior to rolling:
128023409.jpg


1.5 T. roller:
128025100.jpg


All finished :D
128025101.jpg

the "Cub ramp"
 
Thanks guys :D

This process is still fairly new out here. It is about 1/3 the cost of concrete, and about 1/2 the cost of asphalt or chip and seal.

The surface compaction of the finished driveway is about 1600 psi, compared to 1200-1400 for asphalt and 2000-2500 for concrete.

Ralph, you should look into this for your place. Would save you $$$$ over concrete 8)
 