Mike:
That might be an avenue for me to look at for my driveway when the tractor trailers etc., are all done bringing in the stock for my logging road... one good thing about tractor trailers hauling fill - it sure packs the driveway down.
I got some grindings or millings whatever you might call them in your area -- it is the asphalt that is ground prior to resurfacing.. we had about 60 or 70 loads of the stuff brough in - mostly tandem loads.. about 16 yeards each.. I learned to grade with the TD7/8 and then used the Bomag and the Ingersoll-rand vibrating packers to almost seal the grindings. With all the traffice, it makes a good base. In time, maybe after all the trucks are done hauling, we will top it with 2 or 3 inches of good asphalt.. gotta do the curbs first though :!: :!:
Oh, one note about the Bomags -- you don't want to drive them any distance... the one I used was up the road.. about 4 kms I guess... the float wasn't available.. so I drove it sort of, :? :roll: almost 4 kms home... NOT GONNA DO THAT AGAIN :!: :shock: :shock: :? :lol: :lol: :lol: