Building being demolished was of similar size and construction as the larger one on the left. Front end of building faced Main street/Hwy 50. Front end of the building was pretty much taken down by hand, one brick at a time. Demolition has taken a month. Two excavators are currently in the basement digging out debris.
https://scontent-dfw5-2.xx.fbcdn.net/v/ ... e=5E4A3BF4
Pile of crushed rock in alley that the excavator rests on is 10 feet high.
https://scontent-dfw5-2.xx.fbcdn.net/v/ ... e=5E42E7CF
Back/alley end of the building. A lot of the building was taken down brick by brick.
Building being demolished was of similar size and construction as the larger one on the left. Front end of building faced Main street/Hwy 50. Front end of the building was pretty much taken down by hand, one brick at a time. Demolition has taken a month. Two excavators are currently in the basement digging out debris.
https://scontent-dfw5-2.xx.fbcdn.net/v/ ... e=5E4A3BF4
Pile of crushed rock in alley that the excavator rests on is 10 feet high.
https://scontent-dfw5-2.xx.fbcdn.net/v/ ... e=5E42E7CF
Back/alley end of the building. A lot of the building was taken down brick by brick.