Mike,

Looks like you have bitten off, ------well you know. I am sure the local
eating establishments are enjoying your "5, 6, 7, 8 week project". Hang
in there the last nail will soon be in place and you can stand back ----and
think of the next project. :D :D

Good look.
 
Been there, done that Mike! We went about 6 months without a kitchen. Turned out beautiful though. Moved everything - gas and water lines, major appliance locations, added a door and pantry, added a window. Then after it was done, we ended up selling the house about 3 months later!!!
 
Been down that road as well, Mike. Looks like you're doing some much needed repairs and upgrades as well. It will take some getting used to when it's all back together and looking great!
 
This thread brings back many not so wonderful memories...

The end product was beautiful, but the actual work was a PITA... I am glad that it is done. Really liked the pictures of cutting the beam and posts to fit. Nicely done!!!

Mike in La Crosse, WI
 
Its been fun so far except for the plumbing re-do. On my third try before i call a plumber.

That's my good friend Bob using the chainsaw, and one of our "adopted boys" Ralph, showing us the way on the curf cuts.

We started by squaring the ends / bases using a cloth tape and marking around the circumference. Then six or seven cuts on the line with the best worm drive saw we have and finishing off the cut of the center of the log with the sawzall. Perfect.


We saved a 2" thick section of the top beam from the "square up cut" to use as our pattern for making the curf cuts in the uprights. First we traced out the cut on the best side of the pole then went to work with the worm drive again scoring the cutout. Then the chain saw and wood chisel to knock out the chaff and get the general shape. To get the final fit we used a small hand grinder. About 1.5 hours work for the three of us.

We set the top beam using three bottle jacks. An 8" 2 X 4 was nailed onto one end so it would hang in place on the existing wall. We raised the beam to get the jacks under it and jacked it up and into place.

The curf cut uprights were slid under the beam and into place using a 6' digging bar and a hand sledge. Bingo

I am going to repeat this process in another entry way in the old house when Ralph gets out of jail.
:cry:
 
Steve, the sink is moved to the small window in the front. the drain runs out through the rock wall in the same place it did before. It is vented right outside the wall. Then it runs under the driveway and into a small French drain i put under a new cottonwood tree last summer. Nothing from the kitchen goes into the septic tank. Its vented at the tree too.
303597140.jpg
 
thanks for the info Mike the inspecters frown on french drains around here
I like your log arch will you leave it natural or will it get stained.
 
Cabinets were ordered from through Lowes and are made by Schuler. quartersawn oak.

Steve what is an inspector :stooges: I am very sorry to report that my house does not meet the Arizona Registrar of Contractors Building Codes. Please do not report me :tears:
 
Thanks John and all.

I gave in on the plumbing and called Jesus Acuna today. I helped Jesus start his business about six years agp by loaning him the money to buy a Pex outfit. He redid the water lines and drain today after I had it all messed up. Now its right :big afro:
 
Mike:

I was finally able to have a look at your latest project. Wow.. I enjoyed the pics of how you were coping the support logs into the header. Neat :!: :D wayyy 8) :!: :!: Looks like it is finally coming together. I assume that the cabinets are factory pre-fabs? or are the custom work? Either way they look very nice and or pretty darn good quality. Going to be a nice kitchen. :!: :big smile:
 
Good news. Ralph did not have to go to jail afterall, not yet anyway :cry: :cry:

We were able to get the other wood beams placed :D

The top beam on this one needed to be cut out to fit over an existing 6X6 wood beam.

305899467.jpg
305899472.jpg
305899473.jpg
305899474.jpg
305899787.jpg
305899790.jpg
305899796.jpg
305899805.jpg
 
After reading this post I feel inclined to.......well ah...... admit something. Me and my wife built our house in 95, yes 1995. THE KITCHEN IS NOT YET DONE!!!! My wife is pretty special to put up with it all this time. Its functional but not complete.
So what did I do to make up for it. Yep! start another kitchen. Hehehehehe Last summer I added 24x20 onto the shop for a summer kitchen/canning room/rec room. Its not done either but its only been about a yr since I started that one so she has givin me a reprieve on the house till the summer one is done.

So when somebody says they've been without a kitchen for say what ever many mos, heck that ain't notin. We eat on plastic wear so much its been dubbed Amanda, china. :lol: :lol: :lol:
 
Bill, I have the complete set of Amanda Wear. Works for me too.

My grandfather was a carpenter and built his and many other old houses in Belleville, Illinois. My dad showed them all to me when I was young. They all had summer kitchens like yours.

Well, tomorrow Billy is going to finish and level the kitchen floor in brown mortar. I picked up 30 (80lb.) bags of premixed today :tears: I may just stay with brown finished concrete floors.

Bob and I willl mix and carry :tears:

Today I put down some SunTouch electric floor heating. I used this same material about five years back in a new bathroom addition and it is well worh the money, sort of a luxury, but affordable. I plan to go forward with this same mortar set heat throughout the rest of the house too. It's small place.

306055589.jpg
306055586.jpg
306055582.jpg
:lol:
 
Back