As some of you know last year I was going to make a entry way for our camper on our property in Michigan's Eastern UP.
viewtopic.php?f=9&t=36923 Getting the Wood Out from last year.
I wanted to have enough room for a wood stove a few chairs and maybe a folding cot for when we have a lot of people up. Well Dad had four mini strokes Nov 1st while I was working on it and I had to come home. Well two weeks ago Dad and I went up to do some work on the pad for the pole barn we want to put up. Dad had some personal days he had to use up or loose. So we went UP and were planing on staying 2-4 days we ended up staying almost two weeks :!: We had three good dry days and got a lot of work done on the building pad. Then it started raining and it was too wet to work on it. So we started working on our equ up there and fixing things we had been putting off because we did not have time to work on it.
It was still too wet to work on the pad so we decided to put up our entry way. It was going to to be a 12'x20' deck with a 12'x16' room and 4'x12' deck on it. Built on 8"x8" spruce beams so we could drag it around with the dozer and use it for a hunting shack when we didn't need the camper any more.
Well we ended up making the room 12'x20' and its more square footage than the camper so now I guess I will have to call it the living room instead of a entry way :{_}:
Building the deck on 8"x8"x20' spruce beams. The decking is 1.5" spruce broads. All this wood I cut off of our property and my friend sawed on site with his wood mizer saw mill
Checking the window height for shooting.
Looking out the window (to be) up the property line.
Getting the sheeting up on the roof. Eventually I am going to put a gamboral roof on it and have two upstairs bedrooms on top.
Standing behind the trailer looking down the road to our property
Well it was wet muddy and a pain to work in but I am happy with what we got done. Dad used up all his personal days for the year. Dad had to be home to go to work friday. So thursday we got up before sun up and started working. We had to get the roof done as the weather was turning bad again and will be snowing before we get UP again. By time we got done everything packed up and put away and locked the gate it was 11:00 pm. And the start of a six hour drive home. Actually I did not have time to go home and have dad get to work on time so I had to drop him off at work then come back and pick him up when he got off. All in all I was up over 22 hours strait with out a nap and I am not 26 any more. It could only have been the excitement of getting done what we had to do that kept me from falling asleep on the way home as I did all the driving so Dad could sleep before going to work. Needless to say I slept all day friday except for picking Dad up from work.
Billy
viewtopic.php?f=9&t=36923 Getting the Wood Out from last year.
I wanted to have enough room for a wood stove a few chairs and maybe a folding cot for when we have a lot of people up. Well Dad had four mini strokes Nov 1st while I was working on it and I had to come home. Well two weeks ago Dad and I went up to do some work on the pad for the pole barn we want to put up. Dad had some personal days he had to use up or loose. So we went UP and were planing on staying 2-4 days we ended up staying almost two weeks :!: We had three good dry days and got a lot of work done on the building pad. Then it started raining and it was too wet to work on it. So we started working on our equ up there and fixing things we had been putting off because we did not have time to work on it.
It was still too wet to work on the pad so we decided to put up our entry way. It was going to to be a 12'x20' deck with a 12'x16' room and 4'x12' deck on it. Built on 8"x8" spruce beams so we could drag it around with the dozer and use it for a hunting shack when we didn't need the camper any more.
Well we ended up making the room 12'x20' and its more square footage than the camper so now I guess I will have to call it the living room instead of a entry way :{_}:
Building the deck on 8"x8"x20' spruce beams. The decking is 1.5" spruce broads. All this wood I cut off of our property and my friend sawed on site with his wood mizer saw mill
Checking the window height for shooting.
Looking out the window (to be) up the property line.
Getting the sheeting up on the roof. Eventually I am going to put a gamboral roof on it and have two upstairs bedrooms on top.
Standing behind the trailer looking down the road to our property
Well it was wet muddy and a pain to work in but I am happy with what we got done. Dad used up all his personal days for the year. Dad had to be home to go to work friday. So thursday we got up before sun up and started working. We had to get the roof done as the weather was turning bad again and will be snowing before we get UP again. By time we got done everything packed up and put away and locked the gate it was 11:00 pm. And the start of a six hour drive home. Actually I did not have time to go home and have dad get to work on time so I had to drop him off at work then come back and pick him up when he got off. All in all I was up over 22 hours strait with out a nap and I am not 26 any more. It could only have been the excitement of getting done what we had to do that kept me from falling asleep on the way home as I did all the driving so Dad could sleep before going to work. Needless to say I slept all day friday except for picking Dad up from work.
Billy