Bill,

Sometime ago you asked about the backup power for this job site at Denver. Today the load test was perfromed on twin generators. These are Cummings V16's and can roar with the best of them. Here are a few pictures that I took today;

This was taken with 99% load:
DSC_0009.JPG


Here are each of the 3 phases at 480:
DSC_0010.JPG


The next picture I took with the lights out and although these generators are painted Cummings green the RED really stands out :wink:
DSC_0007.JPG

8)
 
It is for the antenna jobb Donny is working on. He posted other pictures earlier. It is in the mountains and I wondered about prime and backup power.
 
Beaconlight,
There is a blackstart generator at one of the hydro plants I work at sometimes, and it has whats looks like two v8 detroit deisel engines welded together. one night we lost power to the station and I will always remember the glow of the exhaust like the pic donny posted. did you have to work on something similar in your job?
john
 
I worked in The Aleutians installing Blue Grass, the DEW Line extension in the late 50,s. We had 4 White Superior straight 8 engines. These were for Prime power for we were 453 miles from town. 2 engines were generally on line. They were air start. The engine cooling was used to supply domestic hot water as well as room heat. It was quite an interesting job. I was lucky for I sent my money home and Bev saved it so that when I got home we bought a house.
 
JBall8019":jqw2dur2 said:
Beaconlight,
There is a blackstart generator at one of the hydro plants I work at sometimes, and it has whats looks like two v8 detroit deisel engines welded together. one night we lost power to the station and I will always remember the glow of the exhaust like the pic donny posted. did you have to work on something similar in your job?
john

When I worked for Benshaw Incorporated, selling solid state motor starters, one of the large projects we worked on was a set of current limiting starters for the "black start" system at the then-NSP High Bridge plant in Minneapolis. After all of the rolling blackouts in California, a great deal of the power companies had to figure out a way to get their plants started again QUICKLY if the blackout rolled back to their substation. I remember them saying that they had 5 - 10 minutes to get the boiler feed pumps back on line or they would have to completely shut the plant down and cool everything off before they could restart... The motor starters we installed were to help keep the framesize one size smaller on the backup generators. It was amazing standing in a plant watching a 2500HP, 2300VAC motor starting up while standing in front of the starter... SERIOUS PUCKER FACTOR there!!

Thanks for bringing back those memories, John...that was a fun stage in my life...

Mike in La Crosse, WI
 
Fresh out of high school (1952) my first job was at a quarry/lime plant. They had some big electric motors (up to 300 HP) that caused serious power factor penalties on startup. They had two diesel generators just to start the heavy loads... one was one of the big Superiors and the other was an Atlas that may have had marine origin. A neighboring plant had three of the big Superiors in their engine room that ran their entire plant.

Both plants were later bought out by the Pfizer company, and later shut down and salvaged. Pfizer much later donated about 200 acres of the land to our county park system. I mention it because that park land is the home of our local S.C.R.A.P. tractor show. (Sandusky County Restorers of Antique Power)

In this picture taken a couple weeks after last year's show the traffic marks still show up. One of the quarrys is partly visible in the background.

aerial%20050.jpg
 
now you guys made me feel bad. my summer home, nome ak, uses 100% diesel for electricity, but i have no pics of their set up. a new one is going up this year to suppliment or replace the old power station. i never paid any attention since the wires didn't reach my digs.
 
Vince t6he ones in the Aleutians had cylinders big enough that when you removed the head from that one( each had it's own head) you could put your head in to check the cylinder. We had to replace the liner in one for it was cracked.
 
beaconlight":1d2coswn said:
Vince t6he ones in the Aleutians had cylinders big enough that when you removed the head from that one( each had it's own head) you could put your head in to check the cylinder. We had to replace the liner in one for it was cracked.

It's been a long time so I don't recall the bore of the Superior cylinders but I'm thinking at least 12" to 14" and there were 8 of them. :D I wish I could go back to those simpler days.
 
george, i hope to show you around the new power plant in freemont next year when it gets completed. i think i will be there on wednesday to take a tour myself.
 
JBall8019":23kviy5v said:
george, i hope to show you around the new power plant in freemont next year when it gets completed. i think i will be there on wednesday to take a tour myself.

I think you're talking about the uncompleted Calpine power plant on Great Grandpa Hensel's farm. It's construction was ill advised because it was intended to be fueled by the wrong fuel... natural gas that was already in short supply when it was approved. I hope it is never finished. Any new power plants should be nuclear fueled now that the drawbacks have been eliminated.

In any event I'll look forward to seeing you again. :D Give me a call and maybe we can get together Wednesday.
 