Control valve O ring and sock.

DennisBufo

Well-known member
This has probably been discussed several times. Anyhow, I pulled my Touch Control Box off. Can anyone direct me to a video or such that shows me how to pull the control valve to replace the O ring and how to replace the valve sock. Many thanks
 
This has probably been discussed several times. Anyhow, I pulled my Touch Control Box off. Can anyone direct me to a video or such that shows me how to pull the control valve to replace the O ring and how to replace the valve sock. Many thanks
There are a couple of good descriptive instructions with photos on this website in the HOW TO Forum under Hydraulics. For a video you could look in YOU TUBE. Also the Steiner Tractor website has a video rebuild video that shows how to remove the control rod during a complete touch control rebuild.
Basically you removie the rock shaft, and yoke/link lever attachment on the front of the control rod, then remove the rear head and push the control from the rear out the front. You might be able to pull the rod out the front without removing the head. However most are doing a complete rebuild, so it is easier to push it out.
 
The valve sock or boot is usually held in place by a twisted wire. After removing the wire just pull the boot off the neck flange on the block.
 
newer style uses a rubber boot, early a leather type, disconnect the linkage at the valve and just pull it out of the housing
 
newer style uses a rubber boot, early a leather type, disconnect the linkage at the valve and just pull it out of the housing
Thanks. Now that I got all the grime cleaned off I see where it disconects via by pulling a small pin. Mine is early one - already ordered a new O ring and socket from TM.
 
FYI... Before pulling that pin, you need to loosen the hex set screw holding it in place.

To make reassembly of the linkage easier, I would take quite a few photos of the disassembly, since it's multi-jointed and a little confusing when putting the linkage back on.... Especially the lower "limit" section.
 
You do not need to take all the linkage apart, just remove the pin and the shaft slides right through the linkage
 
The fun begins. Got the control valve out. Have a new O ring and leather sock from TM. Any thing special I should use to clean the control valve rod? Going to clean and paint the box before putting it back on the Cub.
 

Attachments

  • 20251009_191029.jpg
    20251009_191029.jpg
    244.4 KB · Views: 17
  • 20251009_191033.jpg
    20251009_191033.jpg
    276.4 KB · Views: 17
  • 20251009_191029.jpg
    20251009_191029.jpg
    244.4 KB · Views: 17
I use a a 3m scuff pad if needed, lube the oring and push it in carefully so it does not get cut, as you see it is not a cheap one
 
Serious question: would it be OK to clean the control valve with some VERYY FINE steal wool?
I would be concerned about the steel wool shedding particles that might contaminate the interior. Maybe a really fine scotchbrite pad? Stan
EDIT.....Don't forget to precoat all the parts with HyTRAN before reassembly.
 
Any thing special I should use to clean the control valve rod?
I would use kerosene, and a parts brush. Kerosene is usually what the Cub owner's manuals say to use for cleaning some parts.

After cleaning the control valve, I would dry it, and feel it, any roughness, or grooves need to be smoothed.
Use a flat file on big rough places, or fine sandpaper, 400 grit or so, on smaller roughness. Wipe off all filings with a clean rag. Wash the valve after filing or sanding it.
Use plenty of new Hy-Tran, or similar fluid on the valve to put the o ring on, and to put the valve into the unit.
Feel around the opening for the valve, and smooth it if needed, any roughness can cut the new o ring.
I would stand the unit up with the front end up, and pour some new Hy-Tran into the hole for the valve, so it has new lube in the unit for the valve, then tip the unit front end down, to drain the excess out. Then put in the valve.
Thanks for the pictures.
 
Last edited:
I would use kerosene, and a parts brush. Kerosene is usually what the Cub owner's manuals say to use for cleaning some parts.

After cleaning the control valve, I would dry it, and feel it, any roughness, or grooves need to be smoothed.
Use a flat file on big rough places, or fine sandpaper, 400 grit or so, on smaller roughness. Wipe off all filings with a clean rag. Wash the valve after filing or sanding it.
Use plenty of new Hy-Tran, or similar fluid on the valve to put the o ring on, and to put the valve into the unit.
Feel around the opening for the valve, and smooth it if needed, any roughness can cut the new o ring.
I would stand the unit up with the front end up, and pour some new Hy-Tran into the hole for the valve, so it has new lube in the unit for the valve, then tip the unit front end down, to drain the excess out. Then put in the valve.
Thanks for the pictures.
Many thanks for all the good advice. I think putting atleast one of the cotter pins back is going to be a bear. Am going to paint the box before recounting it.
 
THANKS for all the good advice. I think putting one of the cotter pins in is going to be a bear. Sanded the box so can paint it before putting it back on the cub. Will post results of all this after testing the hydraulics.
 
I quit using frustrating cotter pins in most places when I discovered hitch pins, which come in many sizes, including ones that are perfect for the control rods (throttle rod at gov lever, choke at both ends, starter rod, etc). They can be installed/removed with long nose pliers and require no bending.

51-f7FGK3fL._AC_SY780_.jpg
 
The clip at the right rear side of the engine head holds the long throttle rod, they have said on here it is needed to prevent the rod from flexing.
The clip is supposed to be a straighter shape, below is a picture of it from TM Tractor Parts.

You can adjust the shape of the rod so it naturally stays in the clip, and isn't springing away from it.
Bend it carefully over a long area of it, so it stays in the clip.
Hold the rod near the front of it, when bending it, so you aren't putting force on the arm at the governor.
Bend the clip mostly closed after putting the rod in it, so the rod can't come out of the clip, be sure the rod slides freely in the clip.
The throttle arm at the governor commonly gets tight from no oil. I would oil the pivot while the hood is off the Cub. It takes some time to work oil into the pivot. :)
 

Attachments

  • Cub throttle rod clip.jpg
    Cub throttle rod clip.jpg
    16.6 KB · Views: 0
All great useful information. New paint, control valve O ring, and a new leather sock. I used a wide Zip Tie rather than the wire TM sent with the sock. Will test it out tomorrow .
Also, made my own wire harness as old one was mostly rotten and mouse chewed. No laughing please, hey it works.
 

Attachments

  • 20251006_195505.jpg
    20251006_195505.jpg
    252.6 KB · Views: 16
  • 20251011_134615.jpg
    20251011_134615.jpg
    244.1 KB · Views: 16
Back
Top