New Cub House Coming in Two Weeks

chief

Well-known member
I have the site leveled and ready for the new CUB House and it should be here in two weeks,
the one in the picture is 42 X 20 The one I ordered is going to be 36 X 26 it has 3 12 foot bays,
and I plan on putting roll up doors on the back side outer bays later on,
Barn004.jpg

Barn005.jpg
 
hat will make you a very nice addition. Does that also mean your going to buy a couple more? I'll get down there one of these days to get a look at it.
 
No I don't think she will let me buy any more toys, I just needed to get the ones I have out of the welding shop,
moving things in and out all the time is a pain. and I will let you know when it is up so you can come down and have a look.
maybe your wife will buy you one, Becky got this for my fathers day.
 
cheif who is the manufacturer? I have been looking at some Elephant Structures. I'm just needing storage for over flow.
Ron in Mid Missouri
 
One suggest, is to get some Solar Wrap. It is a thin insulation that lays over the frame work before the tin goes on. it is amazing how much that 1/2 inch of fiberglass and foil helps with the temperature. It also keeps the roof and sides from sweating in temperature changes or when the dew is melting off as my metal carport does. Also, if they offer the mobile home type tie downs rather than just the normal rod driven in ground, get them. They have a much better hold down force. Expect the installers to speak Spanish.
 
yes i'm getting the mobile home type tie downs, and i will add some other tie downs my self, and it is a Carolina carport, www.carolinacarports.com
this is the third one i have got from them, they are good people to work with, when they put up my 20 X 21 with sides and back covered it took one hour and 45 min.
when they put up my 18 X 21 no sides are back it took 45 min.
 
Back
Top