Finally had a concrete floor poured in my old bank barn before Winter set in. Boy it sure begins to fill up quickly!
Those 6x6 post and beam timbers are all setting in place without fasteners. I'd like once and for all to add steel connecting plates to reinforce all of the junctions. I think 1/8 inch (10 ga) thick steel would be sufficient. I'd prefer to use a plate on each side of the junction bolted through. However, my experience drilling accurately through 6 inch oak beams with an auger bit in an angle drive electric drill hasn't been very good in coming out the other side in an exact spot . . . the grain seems to pull the bit as it wishes. So how can I line up the holes in two opposite plates? Yet I've seen beam junctions like this sandwiched between two plates. . . how do they do it?? I suppose I could use lag bolts on each side, or only use a single plate on one side, but I'd prefer the sandwich approach if possible.
Any suggestions how to do this?
Thanks
Those 6x6 post and beam timbers are all setting in place without fasteners. I'd like once and for all to add steel connecting plates to reinforce all of the junctions. I think 1/8 inch (10 ga) thick steel would be sufficient. I'd prefer to use a plate on each side of the junction bolted through. However, my experience drilling accurately through 6 inch oak beams with an auger bit in an angle drive electric drill hasn't been very good in coming out the other side in an exact spot . . . the grain seems to pull the bit as it wishes. So how can I line up the holes in two opposite plates? Yet I've seen beam junctions like this sandwiched between two plates. . . how do they do it?? I suppose I could use lag bolts on each side, or only use a single plate on one side, but I'd prefer the sandwich approach if possible.
Any suggestions how to do this?
Thanks