Finally after almost 2-1/2 years into this project, my Father-in-llaw's GodFather/Uncle's Cub-54 is finally finished and mounted up on Ellie-Mae. Has been for almost a week. Unfortunately, like much of the eastern seaboard, we haven't had enough snow to warrant a blade -- UNTIL 2 days ago :!: :roll: :wink: :lol: :lol:
We go dumped on a bit. On Tuesday evening by 2200 AST, we had about 8 or 9 inches down which necessitated my getting some seat time on Ellie.
boy, what a difference in performace with the lighter more Cub-sized Cub-54 Blade setup. The first night I spent 2 hours plowing the driveway with the plow in the middle index hole and had a blast. Could have done it quicker if I had already had the right hand 12 degree index hole pinned instead. However I did that the next night and still managed to have almost 2 hours of fun. Em did not want to stand on the deck in the very cold weather to take pics of me playing down the 200 foot section to the shop.. I did not go to the brook yet.. maybe the next time.
Next major job will be to finish the Hydraulic Project for this Blade. Then it will be easier, and I won't have to get off of Ellie to change the offset angle. I will still however manage to find a way to prolong the fun each succeeding session.
Boy, did I ever enjoy the snowfall. We are supposed to get possibly another 4 to 6 inches tonight.. on top of the almost 12 we got in the last two falls. Yeah :!: :wink:

We go dumped on a bit. On Tuesday evening by 2200 AST, we had about 8 or 9 inches down which necessitated my getting some seat time on Ellie.
boy, what a difference in performace with the lighter more Cub-sized Cub-54 Blade setup. The first night I spent 2 hours plowing the driveway with the plow in the middle index hole and had a blast. Could have done it quicker if I had already had the right hand 12 degree index hole pinned instead. However I did that the next night and still managed to have almost 2 hours of fun. Em did not want to stand on the deck in the very cold weather to take pics of me playing down the 200 foot section to the shop.. I did not go to the brook yet.. maybe the next time.
Next major job will be to finish the Hydraulic Project for this Blade. Then it will be easier, and I won't have to get off of Ellie to change the offset angle. I will still however manage to find a way to prolong the fun each succeeding session.
Boy, did I ever enjoy the snowfall. We are supposed to get possibly another 4 to 6 inches tonight.. on top of the almost 12 we got in the last two falls. Yeah :!: :wink: